Quickly modify the construction method - メーカー・企業と製品の一覧

Quickly modify the construction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Quickly correct the tilts, steps, and gaps in school facility floors using the Upcon method.

The Upcon method quickly corrects floor deformations in classrooms, gymnasiums, and poolside areas caused by earthquakes and ground subsidence through polyurethane resin injection.

■There is a sense of discomfort when entering the classroom. ■The floor is slanted, posing a risk of injury or worsening health. ■The slanted floor causes the desks to wobble. ■Windows and doors are difficult to close. ■The gym floor is warped. ■The gym stage is distorted. ■Puddles form by the poolside. The "Upcon Method," which uses polyurethane resin, quickly resolves issues caused by floor slanting and warping due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor.

  • Foundation construction

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録